•Flooding
-Preparation for hydrotest
-Enable intervention

•Cleaning
-Removes rust, millscale and debris
-Reduce flow resistance during operation

•Pressure Testing
-Prove system integrity
-Proof of integrity to governing Legislation body/3rd part
•Helium&N2 Leak Detection
-Detect and quantify any leak paths from inside the system

•Dewatering / Drying
-Prepare system for introduction of product
-Reduce chance of hydrate formation

•Bolting
-Bolt tension

Copyright:Copyright2011TEDA TaiDeSen Petroleum Technology Company Ltd.; 津ICP备11004117号-1